Quote

From:

16 Flack Avenue, Hillsdale
NSW 2036

info@speedylinemarking.com.au
ABN 32 673 397 503

Quote Number QUO-1281
Quote Date April 10, 2025
Total $61,600.00
To:
CommProp Group
Hrs/Qty Service Rate/PriceSub Total
176 Albury Homemaker Centre: removal of 176 existing rubber wheel stops throughout the car park

Removal of 100x rubber wheel stops & each of their 4 bolts - $80
Removal in accordance with Australian standard
All speed humps are 100% ethically disposed of at a waste station

$80.00$14,080.00
176 Albury Homemaker Centre: supply & install 176 new concrete wheel stops, installed throughout the car park to replace the ones remove

- bolt and chemically-set them into the asphalt surface upon the car park.
Supply and install concrete wheelstops in accordance with Australian standard

$180.00$31,680.00
176 Albury Homemaker Centre: Paint yellow of the 176 new concrete wheel stops

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$40.00$7,040.00
1 Establishment Fees (Allow for 10 days work - 4x workers)

All work to be conducted in accordance with Australian standards
Speedy Line Marking to provide all insurance documents if required
Speedy Line Marking to provide SWNS if required
Speedy Line Marking to provide Certificate of Currency if required
Speedy Line Marking to provide Company Registration if required

$3,200.00$3,200.00
Sub Total $56,000.00
Tax $5,600.00
Total $61,600.00

Add a comment

Your email address will not be published. Required fields are marked *