Quote

From:

16 Flack Avenue, Hillsdale
NSW 2036

info@speedylinemarking.com.au
ABN 32 673 397 503

Quote Number QUO-1282
Quote Date April 10, 2025
Total $24,266.00
To:
CommProp Group
Hrs/Qty Service Rate/PriceSub Total
93 Albury Homemaker Centre: supply & install of 93 new concrete wheel stops, installed along the shop fronts facing the car park

- bolt and chemically-set them into the asphalt surface upon the car park.
Supply and install concrete wheelstops in accordance with Australian standard

$180.00$16,740.00
93 Albury Homemaker Centre: painting (yellow) of 93 new concrete wheel stops, installed along the shop fronts facing the car park

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$40.00$3,720.00
1 Establishment fees (4x workers x 5days)

All work to be conducted in accordance with Australian standards
Speedy Line Marking to provide all insurance documents if required
Speedy Line Marking to provide SWNS if required
Speedy Line Marking to provide Certificate of Currency if required Speedy Line Marking to provide Company Registration if required

$1,600.00$1,600.00
Sub Total $22,060.00
Tax $2,206.00
Total $24,266.00

Add a comment

Your email address will not be published. Required fields are marked *