16 Flack Avenue, Hillsdale
NSW 2036
info@speedylinemarking.com.au
ABN 32 673 397 503
Quote Number | QUO-1209 |
Quote Date | March 10, 2025 |
Total | $54,351.00 |
Hrs/Qty | Service | Rate/Price | Sub Total |
---|---|---|---|
1 | Internal Linemarking: 90 meters of Green edge line 100mm thick solid line one side (Handrail side) of handrailed walkway. |
$650.00 | $650.00 |
1 | Internal Linemarking: 15m x 2m (doorways) and approx. 5m x 1m (hazardous walkway between doors) of yellow and black diagonal lines on end of breezeway A1 Dulux road master |
$1,800.00 | $1,800.00 |
1 | Internal Linemarking: 19m of yellow and black diagonal lined single hazardous walkway at 1m wide A1 Dulux road master |
$1,140.00 | $1,140.00 |
1 | Internal Linemarking: 40m of yellow and black diagonal lined hazardous walkway in doorways approx. 2.3m wide A1 Dulux road master |
$5,520.00 | $5,520.00 |
2 | Internal Linemarking: 20m x 30m red diagonal lined unload areas. (lines to be solid red at 150mm widths on bare concrete). Perimeter edge line to be solid red line at 100mm width Within the 2 x red diagonal bays (20 x 30) above please allow for 4 off 24 x 3m yellow trailer parking boxes. These boxes will have a 100mm yellow edge line and no infill within the box. |
$7,000.00 | $14,000.00 |
6 | Internal Linemarking: 20m x 9m unload rectangles with red 100mm solid perimeter edge lines – no infill A1 Dulux road master |
$950.00 | $5,700.00 |
6 | Internal Linemarking: 14 x 3m truck parking box centralised within the above 6 x unload red unload areas. This parking box is to be yellow solid line perimeter at 100mm thick A1 Dulux road master |
$750.00 | $4,500.00 |
6 | External Linemarking: trailer unload bays - • 9m wide x 30m long – perimeter edge line red 100mm thick – no infill A1 Dulux road master |
$1,650.00 | $9,900.00 |
6 | External Linemarking: Located centrally within each of the above 6 x bays- • 3m wide x 24m long - perimeter edge line yellow 100mm thick – no infill in box. A1 Dulux road master |
$180.00 | $1,080.00 |
4 | Establishment Fee (4x workers) All work to be conducted in accordance with Australian standards |
$1,280.00 | $5,120.00 |
Sub Total | $49,410.00 |
Tax | $4,941.00 |
Total | $54,351.00 |