16 Flack Avenue, Hillsdale
NSW 2036
info@speedylinemarking.com.au
ABN 32 673 397 503
Quote Number | QUO-1274 |
Quote Date | April 7, 2025 |
Total | $3,261.50 |
Hrs/Qty | Service | Rate/Price | Sub Total |
---|---|---|---|
1 | The client would like to add in Black: One solid central line to divide the driveway into two lanes. Approx. 10m x 200mm. A1 Dulux road master |
$300.00 | $300.00 |
1 | The client would like to add in Black: One solid line to note stop (prior to entering traffic/). Approx. 14m x 100mm. A1 Dulux road master |
$400.00 | $400.00 |
1 | The client would like to add in Black: One “STOP” is to be painted in front of the ‘stop line’ A1 Dulux road master |
$525.00 | $525.00 |
1 | Curb & entry to the driveway area - yellow - The entry of the driveway (including the curb) is to be prepared from old surface paint and repainted as a whole in Yellow. |
$1,100.00 | $1,100.00 |
1 | Establishment Fees (Note: This is to be completed out of hours. The hospital can’t go without access to this loading dock driveway for extended periods) All work to be conducted in accordance with Australian standards |
$640.00 | $640.00 |
Sub Total | $2,965.00 |
Tax | $296.50 |
Total | $3,261.50 |