Quote Number | QUO-1123 |
Quote Date | January 29, 2025 |
Total | $17,935.50 |
Hrs/Qty | Service | Rate/Price | Sub Total |
---|---|---|---|
7 | Car bays with front line A1 Dulux road master |
$60.00 | $420.00 |
32 | OPTION: Supply and install 140mm Bollard - 2m apart between each bollard at 64m long Supply and install Bollard in accordance with Australian standard |
$280.00 | $8,960.00 |
32 | OPTION: Supply and install 90mm Bollard - 2m apart between each bollard at 64m long Supply and install Bollard in accordance with Australian standard |
$180.00 | $5,760.00 |
4 | OPTION: 4 bike racks to be moved 1m back All work in accordance with Australian standard |
$75.00 | $300.00 |
3 | OPTION: Grinding 3x no parking logos All grinding in accordance with Australian standard |
$75.00 | $225.00 |
1 | Establishment Fees All work to be conducted in accordance with Australian standards |
$640.00 | $640.00 |
Sub Total | $16,305.00 |
Tax | $1,630.50 |
Total | $17,935.50 |