16 Flack Avenue, Hillsdale
NSW 2036
info@speedylinemarking.com.au
ABN 32 673 397 503
Quote Number | QUO-1398 |
Quote Date | June 23, 2025 |
Total | $37,966.50 |
Hrs/Qty | Service | Rate/Price | Sub Total |
---|---|---|---|
1 | 12652 BUNNINGS SMITHFIELD CAR PARK: 2x Pedestrian crossing areas: 335m2 A1 Dulux road master |
$5,025.00 | $5,025.00 |
12 | 12652 BUNNINGS SMITHFIELD CAR PARK: Directional arrows A1 Dulux road master |
$50.00 | $600.00 |
12 | 12652 BUNNINGS SMITHFIELD CAR PARK: give way area including centre line A1 Dulux road master |
$50.00 | $600.00 |
112 | 12652 BUNNINGS SMITHFIELD CAR PARK: Car bays A1 Dulux road master |
$20.00 | $2,240.00 |
1 | 12652 BUNNINGS SMITHFIELD CAR PARK: Options grinding - Grinding is not necessary as the surface is asphalt and the existing lines are already faded, with no peeling present. All grinding in accordance with Australian standard using diamond grinding tools |
$8,465.00 | $8,465.00 |
1 | 12652 BUNNINGS SMITHFIELD TIMBER YARD: 312 ml of walkway double line across the timber yard. 624meter line in total A1 Dulux road master |
$3,120.00 | $3,120.00 |
1 | 12652 BUNNINGS SMITHFIELD TIMBER YARD: stop line with black background and letter 500mm high A1 Dulux road master |
$250.00 | $250.00 |
10 | 12652 BUNNINGS SMITHFIELD TIMBER YARD: Directional arrows A1 Dulux road master |
$50.00 | $500.00 |
1 | 12652 BUNNINGS SMITHFIELD TIMBER YARD:54x pedestrian bar A1 Dulux road master |
$1,620.00 | $1,620.00 |
1 | 12652 BUNNINGS SMITHFIELD TIMBER YARD: (Mezzanine) 2x box 13ml each 0,100mm line A1 Dulux road master |
$125.00 | $125.00 |
20 | 12652 BUNNINGS SMITHFIELD TIMBER YARD: Car bays A1 Dulux road master |
$20.00 | $400.00 |
1 | 12652 BUNNINGS SMITHFIELD TIMBER YARD: Option - grinding timber yard 'mandatory' All grinding in accordance with Australian standard using diamond grinding tools |
$6,050.00 | $6,050.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: 2x loading truck bay in red approx 20m long x 3m wide A1 Dulux road master |
$1,560.00 | $1,560.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: set of lettering (TRUCK LINE) in 0.600mm heigh A1 Dulux road master |
$270.00 | $270.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: Walkway = 61ml of double line. 122meter line in total A1 Dulux road master |
$610.00 | $610.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: Hatching area at roller door 9m2 A1 Dulux road master |
$270.00 | $270.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: Driver stand area (green/yellow) A1 Dulux road master |
$125.00 | $125.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: Stop line with stop lettering 500mm - Including black background A1 Dulux road master |
$250.00 | $250.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: Keep clear hatching area with box line approx 5m2 A1 Dulux road master |
$150.00 | $150.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: Directional arrow A1 Dulux road master |
$50.00 | $50.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: Centre line approx 17 ml A1 Dulux road master |
$85.00 | $85.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: - Gas bottle box 5m2 A1 Dulux road master |
$150.00 | $150.00 |
1 | 12652 BUNNINGS SMITHFIELD LOADING DOCK: - Options grinding mandatory loading dock All grinding in accordance with Australian standard using diamond grinding tools |
$2,000.00 | $2,000.00 |
Sub Total | $34,515.00 |
Tax | $3,451.50 |
Total | $37,966.50 |