16 Flack Avenue, Hillsdale
NSW 2036
info@speedylinemarking.com.au
ABN 32 673 397 503
Quote Number | QUO-1358 |
Quote Date | June 2, 2025 |
Total | $18,777.00 |
Hrs/Qty | Service | Rate/Price | Sub Total |
---|---|---|---|
1 | OPTION: 1 x disabled bay A1 Dulux road master |
$250.00 | $250.00 |
1 | OPTION: 1 x shared zone hatching A1 Dulux road master |
$300.00 | $300.00 |
4 | OPTION: 4 x bike bays A1 Dulux road master |
$20.00 | $80.00 |
24 | OPTION: 24 x car bays A1 Dulux road master |
$40.00 | $960.00 |
1 | OPTION: first saw shed racking 19m x 1.2m exclusion in yellow hatching with a yellow line border A1 Dulux road master |
$600.00 | $600.00 |
1 | OPTION: Bin drop area 49ml red box A1 Dulux road master |
$245.00 | $245.00 |
1 | OPTION: banker shop racking 35.8ml x 1.2m hatching with a yellow line border A1 Dulux road master |
$1,200.00 | $1,200.00 |
1 | OPTION: second saw shed racking 9.4m x1.2m hatching yellow with yellow line border A1 Dulux road master |
$300.00 | $300.00 |
4 | GRINDNIG: Directional arrows to remove by grinding on the driveway entrance All grinding in accordance with Australian standard using diamond grinding tools |
$100.00 | $400.00 |
2 | LINE MARKING: Directional arrows on the driveway entrance A1 Dulux road master |
$75.00 | $150.00 |
7 | LINE MARKING: Repaint directional arrows around the warehouse A1 Dulux road master |
$75.00 | $525.00 |
3 | LINE MARKING: 3.8m x 5.6m hatching with lettering 0.200mm ‘PPE must be worn past this point' A1 Dulux road master |
$300.00 | $900.00 |
1 | LINE MARKING: hatching area 1.5m x 1.5m fire hydrant A1 Dulux road master |
$120.00 | $120.00 |
1 | LINE MARKING: hatching area 10m x 1.6m fire hydrant A1 Dulux road master |
$460.00 | $460.00 |
1 | LINE MARKING: pedestrian walkway green and yellow line - 248m to redo and 27m to create A1 Dulux road master |
$8,250.00 | $8,250.00 |
30 | LINE MARKING: legs pedestrian symbols in yellow on the green walkways A1 Dulux road master |
$15.00 | $450.00 |
1 | LINE MARKING: 6m x 3.6 m hatching area inside shed with lettering 0.300mm height 'keep clear Shared lifting zone‘ A1 Dulux road master |
$600.00 | $600.00 |
1 | LINE MARKING: Yellow box 14ml inside the shed A1 Dulux road master |
$100.00 | $100.00 |
1 | LINE MARKING: YRed box - 20ml around shed A1 Dulux road master |
$140.00 | $140.00 |
2 | LINE MARKING: parallel car spot close to shed A1 Dulux road master |
$40.00 | $80.00 |
1 | Establishment Fee All work to be conducted in accordance with Australian standards |
$960.00 | $960.00 |
Sub Total | $17,070.00 |
Tax | $1,707.00 |
Total | $18,777.00 |