Quote

From:

16 Flack Avenue, Hillsdale
NSW 2036

info@speedylinemarking.com.au
ABN 32 673 397 503

Quote Number QUO-1128
Quote Date January 30, 2025
Total $3,410.00
To:
a.fredman@unsw.edu.au
Hrs/Qty Service Rate/PriceSub Total
4 Supply and install removable safety bollards, powder-coated in yellow

Supply and install Bollard in accordance with Australian standard
Core drilling into Asphalt surface needed - approx. 7.5m in width
Features:
- 90mm diameter for discreet yet effective traffic control
-Surface mount installation with a removable design
- Key lock mechanism for secure access control
- Durable construction suitable for outdoor environments
- Ideal for spaces with limited ground penetration

$695.00$2,780.00
1 Establishment fees

All work to be conducted in accordance with Australian standards
Speedy Line Marking to provide all insurance documents if required
Speedy Line Marking to provide SWNS if required
Speedy Line Marking to provide Certificate of Currency if required
Speedy Line Marking to provide Company Registration if required

$320.00$320.00
Sub Total $3,100.00
Tax $310.00
Total $3,410.00

Add a comment

Your email address will not be published. Required fields are marked *