Quote

From:

16 Flack Avenue, Hillsdale
NSW 2036

info@speedylinemarking.com.au
ABN 32 673 397 503

Quote Number QUO-880
Quote Date September 6, 2024
Total $131,372.55
To:
harry@wardangroup.com.au
Hrs/Qty Service Rate/PriceSub Total
1 Basement 1 Concrete Sealing 5788m2

Avista concrete sealer solvent based
All work in accordance with Australian
standard
2 years warranty

$11,576.00$11,576.00
142 Basement 1 Line marking of standard parking bays no.142

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$20.00$2,840.00
23 Basement 1 Line marking of disabled parking logo no. 23

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$250.00$5,750.00
32.16 Basement 1 Chevron 32.16m2

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$30.00$964.80
0 Basement 1 Letter marking on columns no. 0

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$0.00
27 Basement 1 Sā€™ floor marking no. 27

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$50.00$1,350.00
188 Basement 1 Pedestrian footpath marking no. 188

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$12.23$2,300.00
1 Basement 1 Give way line 6.95m

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$125.00$125.00
3 Basement 1 Forward arrow no. 3

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$225.00
1 Basement 1 Right arrow no. 1

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$75.00
5 Basement 1 Left arrow no. 5

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$375.00
1 Basement 1 Joined Forward and Right arrow no. 1

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$75.00
2 Basement 1 Joined Forward and Left arrow no. 2

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$150.00
8 Basement 1 Wheel stops (Black with 8 yellow reflectors)

Supply and install in accordance with Australian standard

$105.00$840.00
25 Basement 1 Bollards (Surface Mounted)

Supply and install in accordance with Australian standard

$480.00$12,000.00
13 Basement 1 Hatching (13 shared zone) and Giveway Lines

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$250.00$3,250.00
1 Basement 2 Concrete Sealing 5788m2

Avista concrete sealer solvent based
All work in accordance with Australian
standard
2 years warranty

$11,576.00$11,576.00
169 Basement 2 Line marking of standard parking bays no. 169

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$20.00$3,380.00
0 Basement 2 Line marking of disabled parking logo no 0

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$250.00$0.00
18.46 Basement 2 Chevron 18.46m2

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$30.00$553.80
1 Basement 2 Hatchings and GiveWay Lines(allow $500 for giveway)

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$500.00$500.00
48 Basement 2 Letter marking on columns no. 48

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$3,600.00
27 Basement 2 Sā€™ floor marking no. 27

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$50.00$1,350.00
218 Basement 2 Pedestrian footpath marking no. 218

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$12.66$2,759.99
1 Basement 2 Give way line 2.5m

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$50.00$50.00
6 Basement 2 Forward arrow no. 6

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$450.00
0 Basement 2 Right arrow no. 0

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$0.00
5 Basement 2 Left arrow no. 5

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$375.00
1 Basement 2 Joined Forward and Right arrow no. 1

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$75.00
2 Basement 2 Joined Forward and Left arrow no. 2

A1 Dulux road master
2 years warranty
All line marking to be applied in accordance with Australians standards

$75.00$150.00
80 Basement 2 Wheel stops (Black with no. 80 yellow reflectors)

Supply and install in accordance with Australian standard

$105.00$8,400.00
25 Basement 2 Bollards (Inground) no 25

Stainless steel IN GROUND bollard
Product ā€“ B168-IG-SS304
168mm x 1200 (plus 500mm inground)
Finish - Stainless steel 30
Supply and install in accordance with Australian standard

$950.00$23,750.00
2 2 x Power Wash: Basement 1 & Basement 2: 5788m2

Power scrub entire area
All work in accordance with Australian standard

$8,682.00$17,364.00
1 Establishment Fees

Approx 10 days
4 workers
All work to be conducted in accordance
with Australian standards
Speedy Line Marking to provide all
insurance documents if required
Speedy Line Marking to provide SWNS if
required
Speedy Line Marking to provide Certificate
of Currency if required
Speedy Line Marking to p

$3,200.00$3,200.00
Sub Total $119,429.59
Tax $11,942.96
Total $131,372.55

Add a comment

Your email address will not be published. Required fields are marked *