16 Flack Avenue, Hillsdale
NSW 2036
info@speedylinemarking.com.au
ABN 32 673 397 503
Quote Number | QUO-906 |
Quote Date | September 17, 2024 |
Total | $5,995.00 |
Hrs/Qty | Service | Rate/Price | Sub Total |
---|---|---|---|
3 | George st: redo floor logos George st car bay floors need to be redone with the new logo stencil |
$200.00 | $600.00 |
1 | George st: redo logo & get rid of the 2 green horizontal line George st column logo needs to have the 2 green horizontal lines on logo filled in with white |
$50.00 | $50.00 |
12 | Pitt st: redo floor logos George st car bay floors need to be redone with the new logo stencil |
$200.00 | $2,400.00 |
8 | Pitt st: Column logo needs to be moved down so that the top of the green line is in line with the top of the bumper logo needs to have the 2 green horizontal lines on each logo filled in with white |
$200.00 | $1,600.00 |
8 | Pitt st: column logo where the green is above the yellow bumper on the column needs to be painted white on the columnC Match the white on the columns |
$100.00 | $800.00 |
1 | Establishment Fees (INCLUDED FREE) All work to be conducted in accordance with Australian standards |
$640.00 | $0.00 |
Sub Total | $5,450.00 |
Tax | $545.00 |
Total | $5,995.00 |